1. HOME
  2. Information
  3. News
  4. 【Supercomputer】Maintenance work performed during the scheduled maintenance

コンテンツ

News

【Supercomputer】Maintenance work performed during the scheduled maintenance

publication date : Sep.21, 2023


The Supercomputer Systems have been updated upon completing the maintenance work performed from september 18 to 21, 2023.

  1. Installation of New Software Versions
  2. Announcing the start of prior use of the service

1. Installation of New Software Versions

The table below shows the new software versions installed after the last maintenance.

For details on how to use each software, please refer to the following web pages:

SoftwareNew VersionModulefile
System A,B,C,G
GNU Compiler 2023 PrgEnvGCC/2023
System B,C,G
LS-PREPOST 4.10.5 ls-prepost/4.10.5
Maple 2023.0 maple/2023.0
Mathematica 13.3.0 mathematica/13.3.0
Adams 2023.2 adams/2023.2
Patran 2023.2 patran/2023.2
Nastran 2023.2 nastran/2023.2
Marc 2023.2 marc/2023.2
Application Server
NICE DCV 2023.0 -
File transfer server(hpcfs)
Archaea tools 1.5.1_11 -

2. Announcing the start of prior use of the service

With this maintenance work, we have completed the preparation of the Personnel Course/Group Course ahead of schedule which had been scheduled to start from October 1.
We hope you will take advantage of this service as it is available from September 21, 10 days ahead of schedule.


Inquiry E-mail:consultkudpc.kyoto-u.ac.jp
Inquiry Form

Back To News

 

Copyright © Institute for Information Management and Communication, Kyoto University, all rights reserved.